Insights

Filter by content type or keywords below

  •  

  • Services

  • Clear all
Projects

Manapouri powerstation ventilation upgrade and refurbishment

In 1994 Jackson’s Otago & Southland Branch Manager Howard Healey prepared a report on the underground powerhouse ventilation systems for the powerstation’s then-owner ECNZ. In 2010, current owner Meridian Energy engaged Healey to provide a condition assessment of station’s ventilation systems as part of the powerstation’s half-life upgrade (it was built in 1971).

Projects

Hellmann Worldwide Logistics Ltd

We were initially asked review the refrigeration tenders Hellmann Worldwide Logistics Ltd had received for their build of a cold-storage and warehousing facility near Auckland Airport. Our role mushroomed from there.

Projects

Air New Zealand headquarters

We were asked to improve tenant comfort and energy use of the 6-year-old HVAC system at the Air NZ headquarters in Auckland. The HVAC system was inefficient, making areas of the building too hot, too cold, stuffy or draughty.

Projects

Rabobank Tower, Auckland CBD

We were asked to work with STACK Interiors to progressively upgrade the 12-storey building, floor by floor. This building comprises of 11 levels of office space and a ground level with a café, reception and waiting area.